IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,870

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0296 # 02 Y:2001 02 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $738 $210 Implemented
NC0215 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $93 $100 Implemented
NC0211 # 01 Y:2001 01 2001 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $23,426 $20,000 Implemented
NC0211 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,719 $800 Implemented
NC0211 # 03 Y:2001 03 2001 USE MINIMUM STEAM OPERATING PRESSURE $2,014 $250 Implemented
NC0211 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,453 $6,000 Implemented
NC0211 # 06 Y:2001 06 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,631 $0 Implemented
TA0005 # 01 Y:2001 01 2001 ELIMINATE/REDUCE AN OPERATION $69,313 $0 Implemented
TA0005 # 04 Y:2001 04 2001 REPAIR AND ELIMINATE STEAM LEAKS $31,880 $1,080 Implemented
TA0005 # 05 Y:2001 05 2001 $17,010 $0 Implemented
TA0005 # 06 Y:2001 06 2001 REDUCE EXCESS STEAM BLEEDING $14,571 $155 Implemented
TA0005 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $14,688 $20,194 Implemented
TA0005 # 08 Y:2001 08 2001 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $6,882 $820 Implemented
TA0005 # 10 Y:2001 10 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,293 $35 Implemented
TA0005 # 11 Y:2001 11 2001 $1,998 $0 Implemented
TA0005 # 12 Y:2001 12 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,855 $277 Implemented
TA0005 # 13 Y:2001 13 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,580 $826 Implemented
GT0710 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,085 $300 Implemented
GT0710 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $4,030 Implemented
GT0710 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $2,450 Implemented
GT0710 # 07 Y:2001 07 2001 $156,450 $5,200 Implemented
SU0116 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $7,323 $979 Implemented
SU0116 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $100 Implemented
SU0116 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $503 $0 Implemented
UD0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,423 $42,285 Implemented