Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0184 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,300 | $15,661 | Implemented |
DL0184 # 10 Y:2020 | 10 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,390 | $3,079 | Implemented |
DL0184 # 12 Y:2020 | 12 | 2020 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,215 | $400 | Implemented |
DL0184 # 11 Y:2020 | 11 | 2020 | REDUCE VENTILATION AIR | $940 | $0 | Implemented |
DL0164 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,513 | $59,950 | Implemented |
DL0158 # 08 Y:2016 | 08 | 2016 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,534 | $96,100 | Implemented |
DL0158 # 02 Y:2016 | 02 | 2016 | REDUCE VENTILATION AIR | $310,823 | $38,750 | Implemented |
DL0158 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,070 | $380,000 | Implemented |
DL0158 # 05 Y:2016 | 05 | 2016 | REDUCE HEAT GAIN BY WINDOW TINTING | $54,090 | $104,500 | Implemented |
DL0134 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,000 | $33,600 | Implemented |
DL0134 # 02 Y:2014 | 02 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $41,430 | $54,000 | Implemented |
DL0134 # 03 Y:2014 | 03 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,580 | $0 | Implemented |
DL0134 # 08 Y:2014 | 08 | 2014 | METER WASTE WATER | $8,610 | $8,200 | Implemented |
DL0128 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $18,200 | $12,560 | Implemented |
DL0128 # 05 Y:2014 | 05 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,000 | $20,000 | Implemented |
DL0128 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,150 | $101,600 | Implemented |
DL0128 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,000 | $150,000 | Implemented |
DL0118 # 06 Y:2013 | 06 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,500 | $0 | Implemented |
DL0118 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,500 | $349,314 | Implemented |
DL0118 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,300 | $3,000 | Implemented |
DL0118 # 10 Y:2013 | 10 | 2013 | INSTALL OCCUPANCY SENSORS | $3,600 | $1,000 | Implemented |
DL0118 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,504 | $20,000 | Implemented |
DL0102 # 01 Y:2013 | 01 | 2013 | REDUCE VENTILATION AIR | $31,820 | $3,200 | Implemented |
DL0102 # 02 Y:2013 | 02 | 2013 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $25,460 | $100 | Implemented |
DL0098 # 01 Y:2012 | 01 | 2012 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $92,987 | $22,000 | Implemented |