Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2402 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,076 | $311,400 | Implemented |
UW2402 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO HEAT WATER | $13,327 | $84,652 | Implemented |
UW2402 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $17,310 | $375 | Implemented |
UW2402 # 05 Y:2024 | 05 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $25,000 | $104,000 | Implemented |
UW2402 # 04 Y:2024 | 04 | 2024 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $55,000 | $117,000 | Implemented |
UW2402 # 02 Y:2024 | 02 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,045 | $582 | Implemented |
UW2402 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,442 | $5,083 | Implemented |
OR0691 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,762 | $1,200 | Implemented |
OR0691 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $955 | $1,955 | Implemented |
UW0037 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $709 | $0 | Implemented |
UW0037 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,711 | $1,060 | Implemented |
UW0026 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,037 | $0 | Implemented |
UW0026 # 06 Y:2009 | 06 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,522 | $19,854 | Implemented |
UW0026 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,715 | $200 | Implemented |
UW0026 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,086 | $19,000 | Implemented |
OR0288 # 05 Y:1997 | 05 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $390 | $1,390 | Implemented |
OR0288 # 03 Y:1997 | 03 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,140 | $0 | Implemented |
OR0288 # 02 Y:1997 | 02 | 1997 | CLEAN CONDENSER TUBES | $1,270 | $5,000 | Implemented |
OR0288 # 01 Y:1997 | 01 | 1997 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $6,130 | $32,400 | Implemented |
OR0219 # 02 Y:1994 | 02 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $936 | $165 | Implemented |
OR0219 # 01 Y:1994 | 01 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $697 | $0 | Implemented |
OR0167 # 02 Y:1993 | 02 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $611 | $1,171 | Implemented |
OR0167 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,559 | $7,500 | Implemented |