IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0648 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,975 $4,500 Implemented
OK0648 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,683 $240 Implemented
OK0648 # 01 Y:2002 01 2002 USE OPTIMUM THICKNESS INSULATION $12,108 $2,317 Implemented
MS0218 # 07 Y:2002 07 2002 DISCONNECT BALLASTS $2,405 $1,230 Implemented
MS0218 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,686 $0 Implemented
MS0218 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,569 $0 Implemented
MS0218 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,718 $0 Implemented
MS0218 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,012 $284 Implemented
SF0248 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $5,341 $6,000 Implemented
SF0248 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,662 $0 Implemented
SF0248 # 06 Y:2002 06 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,409 $13,000 Implemented
SF0248 # 03 Y:2002 03 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,713 $1,685 Implemented
LE0148 # 05 Y:2002 05 2002 INSULATE FEEDWATER TANK $121 $260 Implemented
LE0148 # 10 Y:2002 10 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,308 $990 Implemented
LE0148 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $0 Implemented
LE0148 # 09 Y:2002 09 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,033 $750 Implemented
LE0148 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $4,095 Implemented
LE0148 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $300 Implemented
AM0420 # 06 Y:2002 06 2002 REPAIR OR REPLACE STEAM TRAPS $3,300 $900 Implemented
AM0420 # 08 Y:2002 08 2002 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,500 $150 Implemented
AM0420 # 09 Y:2002 09 2002 USE PHOTOCELL CONTROLS $1,500 $2,300 Implemented
AM0420 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $58,000 $0 Implemented
AM0420 # 10 Y:2002 10 2002 $700 $0 Implemented
TA0039 # 03 Y:2002 03 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,515 $0 Implemented
TA0039 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,330 $0 Implemented