Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0241 # 07 Y:2003 | 07 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,613 | $0 | Implemented |
MS0241 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,854 | $3,600 | Implemented |
MS0241 # 04 Y:2003 | 04 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $11,644 | $760 | Implemented |
MS0241 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $30,220 | $20,410 | Implemented |
MS0241 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,378 | $129 | Implemented |
SU0170 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,181 | $47 | Implemented |
SU0170 # 03 Y:2003 | 03 | 2003 | $31,250 | $1,000 | Implemented | |
SU0170 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,229 | $185 | Implemented |
SU0170 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $466 | $57 | Implemented |
IC0069 # 04 Y:2003 | 04 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $10,894 | $10,560 | Implemented |
IC0069 # 05 Y:2003 | 05 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $6,176 | $341 | Implemented |
IC0069 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,983 | $8,812 | Implemented |
IC0069 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,411 | $2,200 | Implemented |
IC0069 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,894 | $5,280 | Implemented |
UM0243 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $24,928 | $520 | Implemented |
UM0243 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,857 | $150 | Implemented |
UM0243 # 04 Y:2003 | 04 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $13,955 | $6,000 | Implemented |
UM0243 # 01 Y:2003 | 01 | 2003 | $142,452 | $31,500 | Implemented | |
WV0276 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM THICKNESS INSULATION | $8,395 | $2,640 | Implemented |
WV0276 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $33,509 | $580 | Implemented |
WV0276 # 07 Y:2003 | 07 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $2,328 | $480 | Implemented |
WV0276 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $16,926 | Implemented |
WV0276 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $80 | Implemented |
WV0276 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $2,514 | $2,200 | Implemented |
WV0276 # 01 Y:2003 | 01 | 2003 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $41,760 | $60,000 | Implemented |