Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
338
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0143 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $50,294 | $280,937 | Not Implemented |
NC0143 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,615 | $25,600 | Not Implemented |
NC0143 # 04 Y:1998 | 04 | 1998 | REDUCE FLUID FLOW RATES | $2,040 | $2,500 | Not Implemented |
NC0143 # 05 Y:1998 | 05 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,191 | $30,000 | Not Implemented |
NC0143 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,561 | $55,000 | Not Implemented |
NC0133 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,797 | $7,696 | Implemented |
NC0133 # 02 Y:1998 | 02 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,905 | $1,400 | Implemented |
NC0133 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,181 | $27,560 | Not Implemented |
NC0133 # 04 Y:1998 | 04 | 1998 | RECOVER AND REUSE COOLING WATER | $97,026 | $2,000 | Implemented |
NC0133 # 05 Y:1998 | 05 | 1998 | MINIMIZE WATER USAGE | $18,252 | $35,000 | Not Implemented |
NC0133 # 06 Y:1998 | 06 | 1998 | ADD ADDITIONAL PRODUCTION SHIFT | $500,800 | $0 | Implemented |
NC0111 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $21,132 | $6,877 | Not Implemented |
NC0111 # 02 Y:1997 | 02 | 1997 | USE OPTIMUM THICKNESS INSULATION | $245 | $233 | Not Implemented |
NC0111 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $83 | $94 | Implemented |
NC0111 # 04 Y:1997 | 04 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $555 | $55 | Implemented |
NC0111 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $337 | $986 | Not Implemented |
NC0111 # 06 Y:1997 | 06 | 1997 | INSTALL OCCUPANCY SENSORS | $140 | $125 | Not Implemented |
NC0111 # 07 Y:1997 | 07 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,289 | $5,200 | Implemented |
NC0111 # 08 Y:1997 | 08 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $76,000 | $0 | Not Implemented |
TN0613 # 07 Y:1997 | 07 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $280 | $280 | Implemented |
TN0613 # 06 Y:1997 | 06 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $510 | $0 | Not Implemented |
TN0613 # 05 Y:1997 | 05 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,470 | $0 | Not Implemented |
TN0613 # 04 Y:1997 | 04 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $24,170 | $1,040 | Not Implemented |
TN0613 # 03 Y:1997 | 03 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $35,000 | $22,200 | Not Implemented |
TN0613 # 02 Y:1997 | 02 | 1997 | MODIFY STARTUP/SHUTDOWN TIMES | $39,000 | $17,200 | Implemented |