Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,607
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0443 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO HEAT WATER | $4,071 | $12,390 | n/a |
MI0443 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,482 | $240 | n/a |
MI0443 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,571 | $14,916 | n/a |
MI0443 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,162 | $54,938 | n/a |
MI0443 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,913 | $0 | n/a |
MI0443 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,706 | $1,980 | n/a |
WV0664 # 06 Y:2024 | 06 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $792 | $1,500 | n/a |
WV0664 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,777 | $3,541 | n/a |
WV0664 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,469 | $12,134 | n/a |
WV0664 # 09 Y:2024 | 09 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $382 | $328 | n/a |
WV0664 # 10 Y:2024 | 10 | 2024 | INSULATE BARE EQUIPMENT | $121 | $293 | n/a |
WV0664 # 07 Y:2024 | 07 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $535 | $1,139 | n/a |
WV0664 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,056 | $426 | n/a |
WV0664 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $911 | $1,030 | n/a |
WV0664 # 01 Y:2024 | 01 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,899 | $1,019 | n/a |
WV0664 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $391 | $222 | n/a |
UL2405 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $699 | $0 | n/a |
UL2405 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $15,621 | $11,018 | n/a |
UL2405 # 09 Y:2024 | 09 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,682 | $13,000 | n/a |
UL2405 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,190 | $4,575 | n/a |
UL2405 # 10 Y:2024 | 10 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,845 | $13,000 | n/a |
UL2405 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,806 | $233,239 | n/a |
UL2405 # 07 Y:2024 | 07 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $139,372 | $168,400 | n/a |
UL2405 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,858 | $3,659 | n/a |
UL2405 # 08 Y:2024 | 08 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,710 | $0 | n/a |