IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,484

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0300 # 05 Y:1989 05 1989 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,393 $2,000 Implemented
RU0071 # 01 Y:1989 01 1989 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,813 $0 Not Implemented
RU0071 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $295 Implemented
RU0071 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $738 $0 Not Implemented
RU0071 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $117 Not Implemented
RU0071 # 05 Y:1989 05 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,352 $50 Implemented
RU0071 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,906 $6,800 Not Implemented
RU0071 # 07 Y:1989 07 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,674 $2,700 Not Implemented
RU0071 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,772 $500 Implemented
GT0389 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $710 $0 Implemented
GT0389 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $1,021 $895 Implemented
GT0389 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $674 $250 Not Implemented
GT0389 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $195 Not Implemented
GT0389 # 05 Y:1989 05 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,240 $840 Not Implemented
GT0389 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $4,710 $240 Not Implemented
GT0389 # 07 Y:1989 07 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $170 $262 Implemented
GT0389 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $0 Implemented
WI0065 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $5,346 $750 Implemented
WI0065 # 01 Y:1989 01 1989 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $51,883 $300,000 Not Implemented
WI0065 # 02 Y:1989 02 1989 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,109 $6,000 Not Implemented
WI0065 # 03 Y:1989 03 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,165 $15,000 Not Implemented
WI0065 # 04 Y:1989 04 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,568 $8,000 Not Implemented
WI0065 # 06 Y:1989 06 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,916 $0 Implemented
WI0065 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,143 $1,243 Implemented
WI0065 # 08 Y:1989 08 1989 IMPROVE LUBRICATION PRACTICES $1,989 $0 Implemented