IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0119 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,884 $48,211 Implemented
NV0119 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,499 $0 Implemented
NV0111 # 01 Y:1998 01 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,730 $690 Implemented
NV0111 # 02 Y:1998 02 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,601 $1,601 Implemented
NV0111 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,329 $607 Implemented
NV0091 # 04 Y:1997 04 1997 ADJUST BURNERS FOR EFFICIENT OPERATION $1,330 $400 Implemented
NV0091 # 03 Y:1997 03 1997 INSTALL TIMERS AND/OR THERMOSTATS $6,435 $380 Implemented
NV0091 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,073 $245 Implemented
NV0084 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $431 $1,035 Implemented
NV0084 # 08 Y:1997 08 1997 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $450 $690 Implemented
NV0084 # 12 Y:1997 12 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $394 $147 Implemented
NV0084 # 07 Y:1997 07 1997 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $102 $0 Implemented
NV0084 # 13 Y:1997 13 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $437 $120 Implemented
NV0084 # 14 Y:1997 14 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $312 $0 Implemented
NV0084 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,562 $375 Implemented
NV0084 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $258 $308 Implemented
NV0063 # 09 Y:1996 09 1996 USE OPTIMUM THICKNESS INSULATION $4,848 $6,210 Implemented
NV0063 # 11 Y:1996 11 1996 MODIFY MATERIAL APPLICATION METHODS $28,063 $2,040 Implemented
NV0063 # 08 Y:1996 08 1996 USE OPTIMUM THICKNESS INSULATION $9,970 $2,000 Implemented
NV0063 # 07 Y:1996 07 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,535 $5,200 Implemented
NV0063 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $2,375 $1,452 Implemented
NV0063 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $100 $57 Implemented
NV0063 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,184 $90 Implemented
NV0063 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,596 $200 Implemented
NV0039 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $859 $303 Implemented