Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0383 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $552 | $882 | Implemented |
MI0383 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,976 | $1,428 | Implemented |
MI0383 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,327 | $2,436 | Implemented |
MI0383 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,548 | $480 | Not Implemented |
MI0383 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,698 | $1,306 | Implemented |
MI0383 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO HEAT WATER | $10,293 | $12,280 | Implemented |
UF0558 # 05 Y:2020 | 05 | 2020 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $40,098 | $110,800 | Implemented |
UF0558 # 04 Y:2020 | 04 | 2020 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $1,517,489 | $143,275 | Implemented |
UF0558 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,597 | $19,045 | Implemented |
UF0558 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $456 | Implemented |
UF0558 # 03 Y:2020 | 03 | 2020 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $42,983 | $7,127 | Implemented |
MI0380 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO HEAT WATER | $17,031 | $8,409 | Implemented |
MI0380 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,277 | $853 | Not Implemented |
MI0380 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,433 | $12,201 | Implemented |
MI0380 # 08 Y:2020 | 08 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $421 | $1,231 | Not Implemented |
MI0380 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,753 | $3,280 | Implemented |
MI0380 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,272 | $11,460 | Implemented |
MI0380 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,175 | $1,980 | Implemented |
MI0380 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $568 | $120 | Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
UD1024 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $454 | $0 | Not Implemented |