IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 281 Industrial Inorganic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0669 # 17 Y:2024 17 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $135 $363 Implemented
WV0669 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,886 $1,088 Implemented
WV0669 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $19,270 $9,950 Implemented
WV0669 # 03 Y:2024 03 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,442 $5,225 Implemented
WV0669 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,467 $940 Implemented
WV0669 # 13 Y:2024 13 2024 OPTIMIZE PLANT POWER FACTOR $1,227 $5,535 Implemented
WV0669 # 16 Y:2024 16 2024 INSULATE BARE EQUIPMENT $357 $798 Implemented
WV0669 # 14 Y:2024 14 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $843 $1,200 Implemented
WV0669 # 12 Y:2024 12 2024 DEVELOP A REPAIR/REPLACE POLICY $1,463 $1,143 Implemented
UD0881 # 05 Y:2013 05 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,823 $1,200 Implemented
UD0881 # 12 Y:2013 12 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $133 $100 Implemented
UD0881 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $15,000 Implemented
UD0881 # 11 Y:2013 11 2013 USE MINIMUM STEAM OPERATING PRESSURE $184 $200 Implemented
UD0881 # 04 Y:2013 04 2013 DEVELOP A REPAIR/REPLACE POLICY $1,024 $1,525 Implemented
UD0881 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,622 $24,525 Implemented
UD0881 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,257 $0 Implemented
UD0881 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,640 $6,800 Implemented
UD0881 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $50 Implemented
WV0448 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $117 $7 Implemented
WV0448 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,725 $9,258 Implemented
WV0448 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,979 $1,826 Implemented
WV0448 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,103 $1,000 Implemented
WV0447 # 10 Y:2012 10 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,330 $0 Implemented
WV0447 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $7,871 $1,608 Implemented
WV0447 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $19,009 $1,000 Implemented