IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 281 Industrial Inorganic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0537 # 10 Y:2016 10 2016 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,205 $2,550 Not Implemented
SD0537 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,312 $3,610 Implemented
SD0537 # 08 Y:2016 08 2016 USE PHOTOCELL CONTROLS $1,432 $4,070 Not Implemented
SD0537 # 07 Y:2016 07 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,758 $5,550 Not Implemented
SD0537 # 06 Y:2016 06 2016 REDUCE HEAT GAIN BY WINDOW TINTING $2,089 $7,880 Not Implemented
SD0537 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,406 $10,314 Implemented
SD0537 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,320 $22,960 Not Implemented
SD0537 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $10,293 $10,000 Not Implemented
SD0537 # 02 Y:2016 02 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $21,873 $21,829 Not Implemented
SD0537 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,109 $108,180 Not Implemented
UM0471 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,462 $1,750 n/a
UM0471 # 05 Y:2016 05 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,664 $3,435 n/a
UM0471 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,500 n/a
UM0471 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $696 $2,500 n/a
UM0471 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,290 $500 n/a
DL0164 # 06 Y:2016 06 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $319,299 $522,826 Not Implemented
DL0164 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,606 $16,930 Not Implemented
DL0164 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,804 $11,335 Not Implemented
DL0164 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,513 $59,950 Implemented
DL0164 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,095 $32,300 Not Implemented
DL0164 # 01 Y:2016 01 2016 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $109,877 $5,990 Not Implemented
TT0169 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,315 $4,500 Implemented
TT0169 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,575 $3,500 Implemented
TT0169 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $3,461 $3,240 Implemented
TT0169 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,943 $1,500 Implemented