Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,414
matching recommendationsSIC | 282 | Plastics Materials And Synthetics |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0609 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,360 | $25,380 | n/a |
UF0609 # 04 Y:2024 | 04 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $14,767 | $40,488 | n/a |
UF0609 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,174 | $25,504 | n/a |
UF0609 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,546 | $9,000 | n/a |
UF0609 # 06 Y:2024 | 06 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $35,940 | $0 | n/a |
UF0609 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,116 | $322,608 | n/a |
UF0609 # 07 Y:2024 | 07 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $21,071 | $25,000 | n/a |
IP0181 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,823 | $239 | n/a |
IP0181 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $18 | n/a |
IP0181 # 04 Y:2023 | 04 | 2023 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $1,031 | $6,735 | n/a |
IP0181 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $136 | $95 | n/a |
GT0971 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,890 | $1,850 | n/a |
GT0971 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,705 | $17,982 | n/a |
GT0971 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $137,329 | $2,565,299 | n/a |
GT0971 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,632 | $867 | n/a |
GT0971 # 02 Y:2023 | 02 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,384 | $400 | n/a |
GT0971 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,025 | $5,227 | n/a |
TT0303 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,197 | $2,025 | n/a |
TT0303 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,790 | $1,500 | n/a |
TT0303 # 02 Y:2023 | 02 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $33,678 | $1,200 | n/a |
TT0303 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $896 | $100 | n/a |
TT0303 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $39,135 | $0 | n/a |
TT0303 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $11,430 | $3,000 | n/a |
TT0303 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $582 | $800 | n/a |
TT0303 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,028 | $2,000 | n/a |