Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,517
matching recommendationsSIC | 282 | Plastics Materials And Synthetics |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0322 # 01 Y:2025 | 01 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $102,930 | $45,500 | n/a |
IC0322 # 03 Y:2025 | 03 | 2025 | INCREASE AMOUNT OF CONDENSATE RETURNED | $36,404 | $43,673 | n/a |
IC0322 # 08 Y:2025 | 08 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $4,457 | $211 | n/a |
IC0322 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $5,455 | $41,668 | n/a |
IC0322 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $205 | $144 | n/a |
IC0322 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,262 | $24,421 | n/a |
IC0322 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,658 | $693 | n/a |
IC0322 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,536 | $2,000 | n/a |
IC0322 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,041 | $210 | n/a |
IC0322 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,000 | $1,250 | n/a |
IC0322 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $0 | n/a |
KS2438 # 04 Y:2024 | 04 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $11,840 | $2,305 | n/a |
KS2438 # 07 Y:2024 | 07 | 2024 | REPLACE BOILER | $50,929 | $423,280 | n/a |
KS2438 # 08 Y:2024 | 08 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $106,671 | $712,500 | n/a |
KS2438 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,757 | $126,440 | n/a |
KS2438 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,307 | $75,751 | n/a |
KS2438 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,274 | $29,920 | n/a |
KS2438 # 05 Y:2024 | 05 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,618 | $1,634 | n/a |
KS2438 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $37,880 | $29,000 | n/a |
KS2438 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $415,341 | $4,074,007 | n/a |
LS2505 # 04 Y:2025 | 04 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $2,963 | $12,500 | n/a |
LS2505 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,919 | $11,944 | n/a |
LS2505 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,808 | $187,200 | n/a |
LS2505 # 01 Y:2025 | 01 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $22,320 | $0 | n/a |
LS2505 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,223 | $5,320 | n/a |