IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 282 Plastics Materials And Synthetics
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0718 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $28,832 $0 Implemented
WV0535 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $4,153 $511 Implemented
WV0535 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,206 $1,000 Implemented
WV0535 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,538 $578 Implemented
WV0535 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $2,120 Implemented
WV0535 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $691 $30 Implemented
WV0535 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $320 $298 Implemented
WV0535 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $138 Implemented
AM0701 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $1,325 $1,200 Implemented
AM0701 # 08 Y:2016 08 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,420 $210 Implemented
AM0701 # 06 Y:2016 06 2016 USE SYNTHETIC LUBRICANT $35,540 $0 Implemented
AM0701 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $515,000 $75,000 Implemented
AM0701 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $195,000 $2,000 Implemented
AM0701 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,125 $105,700 Implemented
AM0701 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $57,500 $0 Implemented
DL0159 # 01 Y:2016 01 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $287,810 $31,000 Implemented
DL0159 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,590 $188,100 Implemented
DL0159 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,300 $17,825 Implemented
DL0159 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,000 $100,750 Implemented
NC0559 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,787 $1,000 Implemented
NC0559 # 03 Y:2016 03 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,003 $1,000 Implemented
NC0559 # 06 Y:2016 06 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,950 $25,000 Implemented
NC0559 # 07 Y:2016 07 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $34,146 $10,000 Implemented
NC0559 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,231 $2,000 Implemented
NC0559 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $320 Implemented