IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0650 # 10 Y:2023 10 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $136 $388 Implemented
WV0650 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $4,052 $8,935 Implemented
WV0650 # 07 Y:2023 07 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,598 $1,500 Implemented
WV0650 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,595 $891 Implemented
WV0650 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,350 $15,114 Implemented
WV0650 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $10,058 $35,930 Implemented
WV0643 # 07 Y:2023 07 2023 DEVELOP A REPAIR/REPLACE POLICY $693 $671 Implemented
WV0643 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $4,345 $8,691 Implemented
WV0643 # 03 Y:2023 03 2023 INSTALL SET-BACK TIMERS $3,513 $1,125 Implemented
WV0643 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $1,534 $2,013 Implemented
WV0643 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $966 $3,959 Implemented
WV0643 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $829 $2,567 Implemented
WV0643 # 08 Y:2023 08 2023 UPGRADE CONTROLS ON COMPRESSORS $603 $1,520 Implemented
WV0643 # 09 Y:2023 09 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $418 $100 Implemented
WV0643 # 10 Y:2023 10 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $73 $215 Implemented
WV0507 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $25,719 $861 Implemented
WV0507 # 14 Y:2015 14 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,967 $252 Implemented
WV0507 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $3,273 $6,566 Implemented
WV0507 # 12 Y:2015 12 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,922 $278 Implemented
WV0507 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,713 $6,794 Implemented
WV0507 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $18,016 $0 Implemented
WV0507 # 08 Y:2015 08 2015 REPAIR OR REPLACE STEAM TRAPS $26,405 $14,973 Implemented
WV0507 # 07 Y:2015 07 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $32,498 $1,000 Implemented
WV0507 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,644 $4,100 Implemented
WV0493 # 02 Y:2014 02 2014 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,168 $5,300 Implemented