IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0535 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $138 Implemented
WV0535 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $4,153 $511 Implemented
WV0535 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,030 $6,200 Not Implemented
WV0535 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $691 $30 Implemented
WV0535 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,812 $8,931 Not Implemented
WV0535 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,206 $1,000 Implemented
WV0535 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $2,918 $4,500 Not Implemented
WV0535 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $2,120 Implemented
UD0935 # 05 Y:2015 05 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $115,856 $487,083 Not Implemented
UD0935 # 04 Y:2015 04 2015 REDUCE EXCESS STEAM BLEEDING $946,498 $1,450,100 Not Implemented
UD0935 # 03 Y:2015 03 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,230 $2,475 Not Implemented
UD0935 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,176 $3,100 Not Implemented
UD0935 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,152 $0 Implemented
UD0917 # 03 Y:2014 03 2014 RECOVER AND REUSE COOLING WATER $3,388 $0 Implemented
UD0917 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $6,046 $6,000 Not Implemented
UD0917 # 05 Y:2014 05 2014 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $14,607 $30,000 Not Implemented
UD0917 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,576 $13,517 Implemented
UD0917 # 02 Y:2014 02 2014 REDUCE FLUID FLOW RATES $3,671 $0 Not Implemented
UD0917 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,376 $0 Implemented
WV0472 # 07 Y:2013 07 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,101 $15,180 Not Implemented
WV0472 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,009 $3,180 Not Implemented
WV0472 # 10 Y:2013 10 2013 INSULATE BARE EQUIPMENT $3,020 $3,318 Implemented
WV0472 # 08 Y:2013 08 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,509 $1,000 Implemented
WV0472 # 13 Y:2013 13 2013 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,094 $38 Implemented
WV0472 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,824 $356 Implemented