IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0472 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,870 $13,557 Implemented
WV0472 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,173 $11,980 Implemented
WV0472 # 06 Y:2013 06 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,296 $8,760 Not Implemented
WV0472 # 07 Y:2013 07 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,101 $15,180 Not Implemented
WV0472 # 08 Y:2013 08 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,509 $1,000 Implemented
WV0472 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,230 $1,700 Implemented
WV0472 # 10 Y:2013 10 2013 INSULATE BARE EQUIPMENT $3,020 $3,318 Implemented
WV0472 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,009 $3,180 Not Implemented
WV0472 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,824 $356 Implemented
WV0472 # 13 Y:2013 13 2013 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,094 $38 Implemented
WV0472 # 14 Y:2013 14 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,023 $76 Implemented
WV0472 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,536 $5,377 Not Implemented
WV0472 # 16 Y:2013 16 2013 REDUCE EXCESS STEAM BLEEDING $452 $2,152 Implemented
WV0472 # 17 Y:2013 17 2013 DEVELOP A REPAIR/REPLACE POLICY $337 $700 Implemented
MZ0105 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $28,300 Implemented
MZ0105 # 02 Y:2012 02 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $42,257 $4,645 Implemented
MZ0105 # 03 Y:2012 03 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $12,339 $13,500 Not Implemented
MZ0105 # 04 Y:2012 04 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,215 $52,200 Implemented
MZ0105 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $58,099 $39,870 Not Implemented
MZ0105 # 06 Y:2012 06 2012 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $42,514 $318,000 Not Implemented
MZ0105 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $920 $1,160 Not Implemented
MZ0105 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,462 $115,696 Not Implemented
MZ0105 # 09 Y:2012 09 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,288 $2,000 Implemented
MZ0105 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,476 $1,140 Not Implemented
MZ0105 # 11 Y:2012 11 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1 $1 Not Implemented