IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2438 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,757 $126,440 n/a
KS2438 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,274 $29,920 n/a
KS2438 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $415,341 $4,074,007 n/a
KS2438 # 08 Y:2024 08 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $106,671 $712,500 n/a
KS2438 # 07 Y:2024 07 2024 REPLACE BOILER $50,929 $423,280 n/a
KS2438 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,307 $75,751 n/a
KS2438 # 05 Y:2024 05 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,618 $1,634 n/a
KS2438 # 04 Y:2024 04 2024 REPAIR AND ELIMINATE STEAM LEAKS $11,840 $2,305 n/a
KS2438 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $37,880 $29,000 n/a
NC0461 # 08 Y:2012 08 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $458,904 $314,375 Implemented
NC0461 # 07 Y:2012 07 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $41,556 $15,000 Not Implemented
NC0461 # 06 Y:2012 06 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,695 $0 Implemented
NC0461 # 05 Y:2012 05 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $84,150 $40,000 Implemented
NC0461 # 04 Y:2012 04 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $24,541 $2,400 Implemented
NC0461 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,960 $300,000 Not Implemented
NC0461 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,912 $7,160 Implemented
NC0461 # 01 Y:2012 01 2012 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $163,689 $410,000 Not Implemented
NC0287 # 01 Y:2004 01 2004 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $10,282 $9,879 Not Implemented
NC0287 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,536 $1,096 Not Implemented
NC0287 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $100 Implemented
NC0287 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,732 $700 Implemented
NC0287 # 05 Y:2004 05 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,915 $750 Implemented
NC0287 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $803 $1,570 Not Implemented
NC0189 # 08 Y:2000 08 2000 IMPROVE SPACE COMFORT CONDITIONING $9,564 $17,000 Not Implemented
NC0189 # 07 Y:2000 07 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $35,750 $0 Not Implemented