Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0791 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,079 | $5,750 | n/a |
OR0791 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,606 | $17,324 | n/a |
OR0791 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,032 | $0 | n/a |
OR0791 # 01 Y:2024 | 01 | 2024 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $29,053 | $352,000 | n/a |
OR0788 # 06 Y:2024 | 06 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,489 | $150,000 | Not Implemented |
OR0788 # 05 Y:2024 | 05 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,766 | $200,000 | Not Implemented |
OR0788 # 04 Y:2024 | 04 | 2024 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $6,183 | $30,000 | Not Implemented |
OR0788 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,448 | $150,000 | Not Implemented |
OR0788 # 02 Y:2024 | 02 | 2024 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $25,469 | $250,000 | Not Implemented |
OR0788 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $126,866 | $2,500,000 | Implemented |
OR0772 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,514 | $8,385 | Implemented |
OR0772 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,801 | $7,178 | Not Implemented |
OR0772 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $1,312 | $5,390 | Implemented |
OR0772 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,740 | $3,039 | Implemented |
OR0772 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,304 | $25,167 | Not Implemented |
OR0772 # 02 Y:2023 | 02 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,363 | $1,352 | Not Implemented |
OR0706 # 01 Y:2018 | 01 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $12,552 | $1,970 | Implemented |
OR0706 # 02 Y:2018 | 02 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,952 | $28,542 | Not Implemented |
OR0706 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,311 | $2,097 | Not Implemented |
OR0706 # 05 Y:2018 | 05 | 2018 | REDUCE FLUID FLOW RATES | $1,821 | $3,221 | Not Implemented |
OR0706 # 04 Y:2018 | 04 | 2018 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,000 | $24,775 | Implemented |
OR0706 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $854 | $0 | Implemented |
OR0534 # 02 Y:2008 | 02 | 2008 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $7,700 | $167,953 | Not Implemented |
OR0534 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $271 | $0 | Implemented |
OR0534 # 06 Y:2008 | 06 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $1,203 | $0 | Not Implemented |