IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0453 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $70,484 $4,500 Implemented
LE0453 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $3,938 Implemented
LE0453 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,507 $11,250 Implemented
LE0453 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,514 $19,688 Implemented
DL0159 # 01 Y:2016 01 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $287,810 $31,000 Implemented
DL0159 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,000 $100,750 Implemented
DL0159 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,300 $17,825 Implemented
DL0159 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,590 $188,100 Implemented
DL0126 # 01 Y:2014 01 2014 ADOPT IN-HOUSE MATERIAL GENERATION $283,400 $116,500 Implemented
DL0126 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,400 $7,400 Implemented
DL0013 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $2,396 $285 Implemented
DL0013 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,300 $0 Implemented
DL0013 # 05 Y:2008 05 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,700 $10,000 Implemented
DL0013 # 04 Y:2008 04 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $24,218 $25,000 Implemented
DL0013 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $108,300 $104,800 Implemented
LE0208 # 03 Y:2005 03 2005 $25,000 $460 Implemented
LE0208 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,060 $145 Implemented
LE0208 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,869 $750 Implemented
LE0208 # 06 Y:2005 06 2005 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,676 $1,000 Implemented
LE0208 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,758 $2,500 Implemented
LE0208 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,745 $1,250 Implemented
LE0208 # 02 Y:2005 02 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $2,500 Implemented
LE0183 # 02 Y:2004 02 2004 REPAIR OR REPLACE STEAM TRAPS $49,237 $10,000 Implemented
WV0116 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,254 $439 Implemented
WV0116 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,312 $2,000 Implemented