IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2823 Cellulosic Manmade Fibers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0938 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,092 $3,500 Implemented
GT0938 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,814 $18,557 Implemented
GT0938 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,349 $2,000 Implemented
LE0459 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,864 $13,360 Implemented
LE0459 # 02 Y:2018 02 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,140 $9,000 Implemented
LE0459 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,564 $8,400 Implemented
NC0559 # 15 Y:2016 15 2016 DEVELOP A REPAIR/REPLACE POLICY $2,264 $4,256 Implemented
NC0559 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,085 $1,000 Implemented
NC0559 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $494 $347 Implemented
NC0559 # 10 Y:2016 10 2016 USE PHOTOCELL CONTROLS $1,339 $1,600 Implemented
NC0559 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $320 Implemented
NC0559 # 07 Y:2016 07 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $34,146 $10,000 Implemented
NC0559 # 06 Y:2016 06 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,950 $25,000 Implemented
NC0559 # 03 Y:2016 03 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,003 $1,000 Implemented
NC0559 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,787 $1,000 Implemented
NC0559 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,231 $2,000 Implemented
UD0459 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $545,061 $4,500,000 Implemented
UD0459 # 04 Y:1995 04 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,743 $340,000 Implemented
UD0459 # 02 Y:1995 02 1995 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,913 $1,000 Implemented
UD0459 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $9,255 $3,200 Implemented
NV0018 # 04 Y:1995 04 1995 SHADE WINDOWS FROM SUMMER SUN $103 $391 Implemented
NV0018 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $194 $186 Implemented
NV0018 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,017 $0 Implemented
TN0469 # 02 Y:1992 02 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $94,476 $22,010 Implemented
TN0469 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $24,383 $7,272 Implemented