Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 2824 | Organic Fibers, Noncellulosic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0125 # 04 Y:2017 | 04 | 2017 | RECOVER AND REUSE WASTE MATERIAL | $6,187 | $3,150 | Implemented |
UU0125 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,417 | $39,198 | Not Implemented |
UU0125 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,851 | $18,588 | Implemented |
UU0125 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,110 | $20 | Not Implemented |
UU0125 # 01 Y:2017 | 01 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,802 | $0 | Not Implemented |
MS0360 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $244,785 | $930,000 | Not Implemented |
MS0360 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $91,795 | $240,500 | Implemented |
MS0360 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,606 | $18,481 | Not Implemented |
MS0362 # 01 Y:2010 | 01 | 2010 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $129,172 | $586,857 | Implemented |
UA0048 # 01 Y:2010 | 01 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $8,059 | $4,878 | Not Implemented |
UA0048 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $3,976 | $728 | Implemented |
UA0048 # 02 Y:2010 | 02 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $486 | $0 | Implemented |
UA0048 # 03 Y:2010 | 03 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,421 | $0 | Implemented |
UA0048 # 05 Y:2010 | 05 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,545 | $0 | Implemented |
UA0048 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $2,000 | Implemented |
UA0048 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,450 | $0 | Not Implemented |
UF0392 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,532 | $585 | Implemented |
UF0392 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,311 | $8,824 | Implemented |
UF0392 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $535 | $486 | Not Implemented |
UF0392 # 01 Y:2006 | 01 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $32,112 | $2,775 | Implemented |
UF0392 # 02 Y:2006 | 02 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $28,316 | $138,000 | Not Implemented |
UF0392 # 07 Y:2006 | 07 | 2006 | USE OPTIMUM THICKNESS INSULATION | $2,922 | $1,680 | Not Implemented |
UF0392 # 03 Y:2006 | 03 | 2006 | INSTALL OCCUPANCY SENSORS | $238 | $228 | Not Implemented |
LE0243 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,687 | $7,500 | Not Implemented |
LE0243 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $995 | $525 | Not Implemented |