IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

639

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0266 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $282 Implemented
KU0266 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,274 $1,008 Implemented
KU0266 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,624 $100 Implemented
KU0266 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $791 $860 Implemented
KU0266 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $898 $1,500 Implemented
KU0266 # 09 Y:1988 09 1988 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $396 $580 Implemented
OK0209 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38 $0 Implemented
OK0209 # 02 Y:1986 02 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,949 $500 Implemented
OK0209 # 03 Y:1986 03 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,378 $14,090 Implemented
AT0028 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $591 $818 Implemented
AT0028 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,845 $361 Implemented
AT0028 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $825 $0 Implemented
AT0028 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,958 $2,993 Implemented
AT0028 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,759 $300 Implemented
AT0028 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $900 Implemented
ST0045 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,948 $358 Implemented
ST0045 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,018 $200 Implemented
ST0045 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,803 $0 Implemented
ST0045 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $1,141 $0 Implemented
ST0045 # 06 Y:1985 06 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $123 $720 Implemented
ST0045 # 10 Y:1985 10 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $371 $0 Implemented
ST0045 # 11 Y:1985 11 1985 REPAIR AND ELIMINATE STEAM LEAKS $31,090 $500 Implemented
ST0045 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,719 $537 Implemented
ST0045 # 13 Y:1985 13 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $896 $517 Implemented
KU0175 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,551 $484 Implemented