Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,641
matching recommendationsSIC | 283 | Drugs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0043 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,945 | $250 | Not Implemented |
MI0043 # 03 Y:2002 | 03 | 2002 | IMPROVE SPACE COMFORT CONDITIONING | $3,500 | $2,000 | Implemented |
MI0043 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,637 | $5,036 | Not Implemented |
MI0043 # 05 Y:2002 | 05 | 2002 | METER WASTE WATER | $1,102 | $1,454 | Not Implemented |
SD0291 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,611 | $48,000 | n/a |
SD0291 # 02 Y:2002 | 02 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $324,586 | $870,000 | n/a |
SD0291 # 03 Y:2002 | 03 | 2002 | USE PHOTOCELL CONTROLS | $14,793 | $5,000 | Not Implemented |
SD0291 # 04 Y:2002 | 04 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $22,460 | $1,500 | Implemented |
SD0291 # 05 Y:2002 | 05 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,452 | $0 | Implemented |
SD0291 # 06 Y:2002 | 06 | 2002 | RECYCLE NONFERROUS DUST | $2,530 | $0 | Implemented |
SD0291 # 07 Y:2002 | 07 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,452 | $6,000 | Not Implemented |
SD0291 # 08 Y:2002 | 08 | 2002 | PAY UTILITY BILLS ON TIME | $626 | $0 | Not Implemented |
LE0129 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,028 | $2,500 | Implemented |
LE0129 # 02 Y:2002 | 02 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,610 | $500 | Implemented |
LE0129 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $723 | $0 | Implemented |
LE0129 # 04 Y:2002 | 04 | 2002 | IMPROVE LUBRICATION PRACTICES | $361 | $200 | Not Implemented |
LE0129 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,270 | $1,000 | Not Implemented |
NC0228 # 01 Y:2002 | 01 | 2002 | $296,000 | $75,000 | n/a | |
NC0228 # 02 Y:2002 | 02 | 2002 | USE COMPRESSOR AIR FILTERS | $41,667 | $10,600 | n/a |
NC0228 # 03 Y:2002 | 03 | 2002 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $173,756 | $88,000 | n/a |
NC0228 # 04 Y:2002 | 04 | 2002 | REDESIGN PROCESS | $74,974 | $100,000 | n/a |
NC0228 # 05 Y:2002 | 05 | 2002 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $12,426 | $39,808 | n/a |
SF0224 # 01 Y:2001 | 01 | 2001 | INSTALL OCCUPANCY SENSORS | $9,345 | $540 | n/a |
SF0224 # 02 Y:2001 | 02 | 2001 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $1,556 | $0 | n/a |
SF0224 # 03 Y:2001 | 03 | 2001 | CLOSE OFF UNNEEDED STEAM LINES | $2,618 | $172 | n/a |