IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0332 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $406 $86 Not Implemented
NC0332 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $389 $277 Not Implemented
NC0332 # 03 Y:2006 03 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $17,210 $28,200 Not Implemented
NC0332 # 02 Y:2006 02 2006 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $39,950 $210,000 Not Implemented
NC0332 # 01 Y:2006 01 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,455 $12,000 Not Implemented
NC0321 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,543 $1,070 Implemented
NC0321 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $696 $50 Not Implemented
NC0321 # 03 Y:2005 03 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $19,559 $3,000 Implemented
NC0321 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,185 $5,475 Implemented
NC0321 # 01 Y:2005 01 2005 USE AUTOMATIC CLEANING EQUIPMENT $23,071 $15,000 Not Implemented
NC0321 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $60 $179 Not Implemented
NC0283 # 01 Y:2004 01 2004 $22,500 $18,300 Not Implemented
NC0283 # 02 Y:2004 02 2004 RECOVER AND REUSE COOLING WATER $7,112 $6,000 Implemented
NC0283 # 03 Y:2004 03 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,469 $1,200 Implemented
NC0283 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,379 $6,899 Not Implemented
NC0283 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,077 $356 Implemented
NC0228 # 05 Y:2002 05 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $12,426 $39,808 n/a
NC0228 # 04 Y:2002 04 2002 REDESIGN PROCESS $74,974 $100,000 n/a
NC0228 # 03 Y:2002 03 2002 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $173,756 $88,000 n/a
NC0228 # 02 Y:2002 02 2002 USE COMPRESSOR AIR FILTERS $41,667 $10,600 n/a
NC0228 # 01 Y:2002 01 2002 $296,000 $75,000 n/a
NC0133 # 06 Y:1998 06 1998 $500,800 $0 Implemented
NC0133 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $18,252 $35,000 Not Implemented
NC0133 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $97,026 $2,000 Implemented
NC0133 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $27,560 Not Implemented