NL0061 # 01 Y:2022 | 01 | 2022 | METER WASTE WATER | $9,914 | $580 | Not Implemented |
NL0061 # 02 Y:2022 | 02 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $9,080 | $70 | Implemented |
NL0061 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,939 | $70 | Implemented |
NL0061 # 04 Y:2022 | 04 | 2022 | METER WASTE WATER | $3,714 | $580 | Not Implemented |
NL0061 # 05 Y:2022 | 05 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $3,432 | $3,500 | Implemented |
NL0061 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $2,500 | Implemented |
NL0061 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $967 | $1,650 | Not Implemented |
NL0061 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $595 | $1,289 | Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
UD1024 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $454 | $0 | Not Implemented |
UD1024 # 02 Y:2020 | 02 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $44,273 | $40,000 | Not Implemented |
UD1024 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $37,324 | $1,300 | Not Implemented |
UD1024 # 04 Y:2020 | 04 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,421 | $0 | Not Implemented |
UD1024 # 05 Y:2020 | 05 | 2020 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $921,416 | $672,400 | Not Implemented |
UD1024 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,582 | $24,500 | Not Implemented |
UD1024 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,282 | $28,000 | Not Implemented |
UD1024 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,759 | $10,650 | Implemented |
UD1024 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $40,609 | $80,500 | Not Implemented |
UD1024 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,326 | $30,000 | Not Implemented |
UD1024 # 11 Y:2020 | 11 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $636 | $0 | Implemented |
IP0141 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,298 | $5,206 | Not Implemented |