IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0458 # 01 Y:2015 01 2015 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,036 $0 Implemented
UM0455 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,725 $25,000 Not Implemented
UM0455 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,338 $2,500 Implemented
UM0455 # 04 Y:2015 04 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,274 $7,300 Implemented
UM0455 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,898 $500 Implemented
UM0455 # 02 Y:2015 02 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $8,778 $0 Not Implemented
UM0455 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,635 $2,000 Not Implemented
UM0350 # 01 Y:2009 01 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,346 $12,800 Not Implemented
UM0350 # 08 Y:2009 08 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $649 $1,200 Implemented
UM0350 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $846 $474 Not Implemented
UM0350 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,186 $10,960 Not Implemented
UM0350 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,990 $100 Not Implemented
UM0350 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,744 $30,000 Implemented
UM0350 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $7,300 $1,500 Not Implemented
UM0350 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $13,487 $13,000 Implemented
UM0190 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,684 $1,000 Not Implemented
UM0190 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $20,286 $8,250 Implemented
UM0190 # 04 Y:2001 04 2001 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $293,000 $360,000 Not Implemented
UM0190 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $82,700 $8,000 Not Implemented
UM0190 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $20,468 $9,600 Not Implemented
UM0190 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $81,576 $80,632 Implemented
ND0169 # 01 Y:1993 01 1993 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $49,625 $65,000 Not Implemented
ND0169 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $125 $200 Not Implemented
ND0169 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $235 $200 Not Implemented
ND0169 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $430 Not Implemented