IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
SIC 2841 Soap And Other Detergents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0921 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,887 $950 Implemented
UD0921 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,838 $1,250 Not Implemented
UD0921 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $1,000 Not Implemented
UD0921 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,618 $700 Not Implemented
LE0388 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,857 $1,520 Implemented
LE0388 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $11,147 $21,250 Not Implemented
LE0388 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $1,000 Implemented
LE0388 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,556 $3,052 Not Implemented
LE0388 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,333 $20,147 Implemented
LE0388 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,432 $16,500 Not Implemented
LE0388 # 07 Y:2015 07 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,735 $9,703 Not Implemented
LE0388 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $272 $1,200 Implemented
LE0322 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,515 $1,000 Implemented
LE0322 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,000 $8,500 Implemented
LE0322 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $781 $8,625 Not Implemented
LE0322 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $188 $175 Not Implemented
MZ0003 # 06 Y:2007 06 2007 ADD AREA LIGHTING SWITCHES $3,995 $500 Not Implemented
MZ0003 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $5,992 $2,950 Not Implemented
MZ0003 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $45,032 $4,012 Not Implemented
MZ0003 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,859 $30,000 Not Implemented
MZ0003 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,702 $7,764 Not Implemented
MZ0003 # 01 Y:2007 01 2007 REPLACE BOILER $237,208 $220,000 Not Implemented
AM0521 # 01 Y:2007 01 2007 REPAIR OR REPLACE STEAM TRAPS $183,000 $1,635 Implemented
AM0521 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,670 $20,000 Implemented
AM0521 # 02 Y:2007 02 2007 REPLACE BOILER $65,200 $150,000 Not Implemented