IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2843 Surface Active Agents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0934 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,058 $330 Implemented
UD0934 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,944 $75,059 Implemented
UD0934 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,084 $2,000 Implemented
UD0934 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $250 $224 Implemented
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented
UD0832 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $500 Implemented
UD0832 # 06 Y:2011 06 2011 UPGRADE OBSOLETE EQUIPMENT $4,243 $4,728 Implemented
UD0832 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,419 $39,141 Implemented
UD0832 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,977 $1,063 Implemented
UD0832 # 02 Y:2011 02 2011 DISCONNECT BALLASTS $2,570 $250 Implemented
UD0832 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,751 $40,000 Implemented
UD0760 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,006 $1,250 Implemented
UD0760 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $563 $48 Implemented
UD0760 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,886 $6,000 Implemented
UD0760 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $3,677 $13,959 Implemented
UD0760 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,030 $2,760 Implemented
UD0760 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,480 $0 Implemented
UD0760 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $10,167 $6 Implemented
UD0736 # 13 Y:2006 13 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,098 $0 Implemented
UD0736 # 12 Y:2006 12 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,612 $26,000 Implemented
UD0736 # 09 Y:2006 09 2006 REPAIR OR REPLACE STEAM TRAPS $11,892 $240 Implemented
UD0736 # 08 Y:2006 08 2006 INSULATE FEEDWATER TANK $12,187 $6,825 Implemented
UD0736 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,264 $40,000 Implemented
UD0736 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,384 $28,000 Implemented
UD0736 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $35,184 $14,041 Implemented