IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

741

matching recommendations
Reset
SIC 285 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0522 # 01 Y:2007 01 2007 INCREASE USE OF AUTOMATION $4,990 $0 Implemented
AM0522 # 02 Y:2007 02 2007 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,575 $6,700 Not Implemented
AM0522 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $2,200 $6,200 Not Implemented
AM0522 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,600 $250 Implemented
AM0522 # 05 Y:2007 05 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $810 $0 Not Implemented
AM0522 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $810 $245 Implemented
AM0522 # 07 Y:2007 07 2007 INSTALL SKYLIGHTS $760 $1,760 Not Implemented
AM0522 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $565 $200 Not Implemented
AM0522 # 09 Y:2007 09 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $440 $0 Not Implemented
AM0522 # 10 Y:2007 10 2007 USE SYNTHETIC LUBRICANT $150 $0 Not Implemented
MA0596 # 01 Y:2006 01 2006 $50,414 $4,000 Implemented
MA0596 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,617 $75,860 Implemented
MA0596 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,740 $5,440 Implemented
MA0596 # 04 Y:2006 04 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $9,148 $4,500 Implemented
MA0596 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,400 $37,895 Implemented
MA0596 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,195 $13,000 Implemented
MA0596 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $4,855 $8,000 Implemented
MA0596 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,870 $18,200 Not Implemented
MA0596 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,026 $5,350 Implemented
MA0596 # 10 Y:2006 10 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,415 $9,840 Implemented
MA0596 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $458 $0 Not Implemented
MA0596 # 12 Y:2006 12 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $900 Not Implemented
AM0496 # 01 Y:2005 01 2005 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $35,000 $102,400 Not Implemented
AM0496 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $6,400 $8,050 Implemented
AM0496 # 03 Y:2005 03 2005 PAY UTILITY BILLS ON TIME $1,448 $0 Implemented