Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
741
matching recommendationsSIC | 285 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0188 # 05 Y:2001 | 05 | 2001 | $3,333 | $1,500 | Implemented | |
OK0613 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $10,756 | $1,026 | Not Implemented |
OK0613 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,071 | $4,000 | Implemented |
OK0613 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $456 | $2,600 | Implemented |
OK0613 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,475 | $7,120 | Not Implemented |
OK0613 # 05 Y:2001 | 05 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,508 | $6,000 | Not Implemented |
OK0613 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $54,883 | $20,680 | Not Implemented |
OK0613 # 07 Y:2001 | 07 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,400 | $572 | Not Implemented |
OK0613 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $304 | $125 | Not Implemented |
NC0211 # 01 Y:2001 | 01 | 2001 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,426 | $20,000 | Implemented |
NC0211 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,719 | $800 | Implemented |
NC0211 # 03 Y:2001 | 03 | 2001 | USE MINIMUM STEAM OPERATING PRESSURE | $2,014 | $250 | Implemented |
NC0211 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,453 | $6,000 | Implemented |
NC0211 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,002 | $1,028 | Not Implemented |
NC0211 # 06 Y:2001 | 06 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,631 | $0 | Implemented |
NC0211 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,506 | $1,239 | Not Implemented |
NC0211 # 08 Y:2001 | 08 | 2001 | $5,184 | $9,200 | Not Implemented | |
SU0116 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $200 | $0 | Not Implemented |
SU0116 # 02 Y:2001 | 02 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $18,236 | $114,000 | Not Implemented |
SU0116 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $7,323 | $979 | Implemented |
SU0116 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $5,330 | $16,000 | Not Implemented |
SU0116 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $418 | $100 | Implemented |
SU0116 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $329 | $0 | Not Implemented |
SU0116 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $503 | $0 | Implemented |
MA0481 # 01 Y:2001 | 01 | 2001 | $17,820 | $30,000 | Implemented |