Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
745
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0170 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,400 | $0 | Not Implemented |
SU0170 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,210 | $0 | Not Implemented |
SU0170 # 03 Y:2003 | 03 | 2003 | ADVERTISE PRODUCT OR SERVICE | $31,250 | $1,000 | Implemented |
SU0170 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,181 | $47 | Implemented |
SU0170 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $466 | $57 | Implemented |
SU0170 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,229 | $185 | Implemented |
SU0170 # 07 Y:2003 | 07 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,666 | $16,761 | Not Implemented |
SU0170 # 08 Y:2003 | 08 | 2003 | REPLACE BOILER | $10,809 | $33,514 | Not Implemented |
IC0069 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,411 | $2,200 | Implemented |
IC0069 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,983 | $8,812 | Implemented |
IC0069 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,894 | $5,280 | Implemented |
IC0069 # 04 Y:2003 | 04 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $10,894 | $10,560 | Implemented |
IC0069 # 05 Y:2003 | 05 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $6,176 | $341 | Implemented |
IC0069 # 06 Y:2003 | 06 | 2003 | REDESIGN PROCESS | $579 | $1,984 | Not Implemented |
IC0069 # 07 Y:2003 | 07 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,246 | $26,552 | Not Implemented |
IC0069 # 08 Y:2003 | 08 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,618 | $251,040 | Not Implemented |
WV0276 # 01 Y:2003 | 01 | 2003 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $41,760 | $60,000 | Implemented |
WV0276 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $33,509 | $580 | Implemented |
WV0276 # 03 Y:2003 | 03 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $30,964 | $9,195 | Not Implemented |
WV0276 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,969 | $500 | Not Implemented |
WV0276 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM THICKNESS INSULATION | $8,395 | $2,640 | Implemented |
WV0276 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $16,926 | Implemented |
WV0276 # 07 Y:2003 | 07 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $2,328 | $480 | Implemented |
WV0276 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $2,514 | $2,200 | Implemented |
WV0276 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $80 | Implemented |