Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
745
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0315 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $2,608 | $1,832 | Not Implemented |
LE0124 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,821 | $2,500 | Not Implemented |
LE0124 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $81,412 | $10,000 | Not Implemented |
LE0124 # 03 Y:2001 | 03 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,427 | $1,000 | Not Implemented |
LE0124 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $64,534 | $34,550 | Not Implemented |
LE0124 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $6,721 | $400 | Not Implemented |
LE0124 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,798 | $0 | Not Implemented |
UM0188 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,363 | $1,083 | Not Implemented |
UM0188 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,080 | $500 | Not Implemented |
UM0188 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,400 | $2,800 | Not Implemented |
UM0188 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $263 | $1,020 | Not Implemented |
UM0188 # 05 Y:2001 | 05 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $3,333 | $1,500 | Implemented |
OK0613 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $10,756 | $1,026 | Not Implemented |
OK0613 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,071 | $4,000 | Implemented |
OK0613 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $456 | $2,600 | Implemented |
OK0613 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,475 | $7,120 | Not Implemented |
OK0613 # 05 Y:2001 | 05 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,508 | $6,000 | Not Implemented |
OK0613 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $54,883 | $20,680 | Not Implemented |
OK0613 # 07 Y:2001 | 07 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,400 | $572 | Not Implemented |
OK0613 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $304 | $125 | Not Implemented |
NC0211 # 01 Y:2001 | 01 | 2001 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,426 | $20,000 | Implemented |
NC0211 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,719 | $800 | Implemented |
NC0211 # 03 Y:2001 | 03 | 2001 | USE MINIMUM STEAM OPERATING PRESSURE | $2,014 | $250 | Implemented |
NC0211 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,453 | $6,000 | Implemented |
NC0211 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,002 | $1,028 | Not Implemented |