IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

745

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0211 # 06 Y:2001 06 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,631 $0 Implemented
NC0211 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,506 $1,239 Not Implemented
NC0211 # 08 Y:2001 08 2001 ADOPT IN-HOUSE MATERIAL GENERATION $5,184 $9,200 Not Implemented
MA0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $1,315 Implemented
MA0481 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,400 $10,000 Not Implemented
MA0481 # 07 Y:2001 07 2001 INSULATE FEEDWATER TANK $375 $1,000 Implemented
MA0481 # 08 Y:2001 08 2001 INSULATE FEEDWATER TANK $260 $1,300 Not Implemented
MA0481 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,820 $30,000 Implemented
MA0481 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,390 $5,500 Implemented
MA0481 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,380 $4,800 Not Implemented
MA0481 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,370 $7,000 Implemented
ME0300 # 01 Y:2000 01 2000 REDUCE VENTILATION AIR $42,906 $66,000 Not Implemented
ME0300 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,547 $13,428 Not Implemented
ME0300 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $765 $850 Not Implemented
ME0300 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,323 $3,625 Not Implemented
ME0300 # 05 Y:2000 05 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $5,600 $9,000 Implemented
WI0374 # 01 Y:2000 01 2000 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $322,000 $100,000 Not Implemented
WI0374 # 02 Y:2000 02 2000 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $42,500 $75,000 Not Implemented
WI0374 # 03 Y:2000 03 2000 MODIFY WORKLOAD $34,000 $2,000 Implemented
WI0374 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,097 $26,587 Not Implemented
WI0374 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $4,012 $12,000 Not Implemented
WI0374 # 06 Y:2000 06 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,307 $0 Not Implemented
WI0374 # 07 Y:2000 07 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,711 $8,000 Implemented
WI0374 # 08 Y:2000 08 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,394 $500 Implemented
WI0374 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,934 $940 Not Implemented