Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0405 # 04 Y:2010 | 04 | 2010 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $31,421 | $0 | Not Implemented |
NC0405 # 03 Y:2010 | 03 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $1,096 | $4,858 | Not Implemented |
NC0405 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $900 | $100 | Implemented |
NC0405 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $227 | $200 | Implemented |
NC0382 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,333 | $100 | Implemented |
NC0382 # 01 Y:2008 | 01 | 2008 | Alternate Fuel | $1,350 | $1,000 | Implemented |
NC0382 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,305 | $8,000 | Not Implemented |
NC0382 # 03 Y:2008 | 03 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,864 | $6,150 | Not Implemented |
NC0382 # 05 Y:2008 | 05 | 2008 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,226 | $0 | Implemented |
NC0382 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,644 | $2,483 | Implemented |
NC0382 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,264 | $4,408 | Implemented |
NC0361 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,209 | $1,540 | Implemented |
NC0361 # 06 Y:2007 | 06 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,849 | $1,200 | Implemented |
NC0361 # 08 Y:2007 | 08 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $452 | $500 | Implemented |
NC0361 # 10 Y:2007 | 10 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $553 | $0 | Not Implemented |
NC0361 # 11 Y:2007 | 11 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $376 | $1,000 | Not Implemented |
NC0361 # 07 Y:2007 | 07 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,150 | $1,200 | Implemented |
NC0361 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $579 | $100 | Implemented |
NC0361 # 04 Y:2007 | 04 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $658 | $617 | Implemented |
NC0361 # 03 Y:2007 | 03 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,894 | $19,950 | Not Implemented |
NC0361 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,791 | $1,674 | Implemented |
NC0361 # 09 Y:2007 | 09 | 2007 | KEEP BOILER TUBES CLEAN | $1,550 | $2,395 | Not Implemented |
NC0211 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,002 | $1,028 | Not Implemented |
NC0211 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,453 | $6,000 | Implemented |
NC0211 # 03 Y:2001 | 03 | 2001 | USE MINIMUM STEAM OPERATING PRESSURE | $2,014 | $250 | Implemented |