IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0405 # 04 Y:2010 04 2010 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $31,421 $0 Not Implemented
NC0405 # 03 Y:2010 03 2010 DEVELOP A REPAIR/REPLACE POLICY $1,096 $4,858 Not Implemented
NC0405 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $100 Implemented
NC0405 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $227 $200 Implemented
NC0382 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,333 $100 Implemented
NC0382 # 01 Y:2008 01 2008 Alternate Fuel $1,350 $1,000 Implemented
NC0382 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,305 $8,000 Not Implemented
NC0382 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $11,864 $6,150 Not Implemented
NC0382 # 05 Y:2008 05 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,226 $0 Implemented
NC0382 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $1,644 $2,483 Implemented
NC0382 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $4,408 Implemented
NC0361 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,209 $1,540 Implemented
NC0361 # 06 Y:2007 06 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $1,849 $1,200 Implemented
NC0361 # 08 Y:2007 08 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $452 $500 Implemented
NC0361 # 10 Y:2007 10 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $553 $0 Not Implemented
NC0361 # 11 Y:2007 11 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $376 $1,000 Not Implemented
NC0361 # 07 Y:2007 07 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $1,150 $1,200 Implemented
NC0361 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $579 $100 Implemented
NC0361 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $658 $617 Implemented
NC0361 # 03 Y:2007 03 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,894 $19,950 Not Implemented
NC0361 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,791 $1,674 Implemented
NC0361 # 09 Y:2007 09 2007 KEEP BOILER TUBES CLEAN $1,550 $2,395 Not Implemented
NC0211 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,002 $1,028 Not Implemented
NC0211 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,453 $6,000 Implemented
NC0211 # 03 Y:2001 03 2001 USE MINIMUM STEAM OPERATING PRESSURE $2,014 $250 Implemented