Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0315 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,749 | $7,491 | Not Implemented |
AS0315 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $105 | $525 | Not Implemented |
AS0315 # 04 Y:2001 | 04 | 2001 | CLEAR AND RENT EXISTING SPACE | $32,448 | $3,360 | Not Implemented |
AS0315 # 05 Y:2001 | 05 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $81 | $306 | Not Implemented |
AS0315 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $2,608 | $1,832 | Not Implemented |
AS0315 # 01 Y:2001 | 01 | 2001 | USE SYNTHETIC LUBRICANT | $221 | $174 | Not Implemented |
LE0124 # 03 Y:2001 | 03 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,427 | $1,000 | Not Implemented |
LE0124 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,798 | $0 | Not Implemented |
LE0124 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $6,721 | $400 | Not Implemented |
LE0124 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $64,534 | $34,550 | Not Implemented |
LE0124 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $81,412 | $10,000 | Not Implemented |
LE0124 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,821 | $2,500 | Not Implemented |
UM0188 # 05 Y:2001 | 05 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $3,333 | $1,500 | Implemented |
UM0188 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $263 | $1,020 | Not Implemented |
UM0188 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,400 | $2,800 | Not Implemented |
UM0188 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,080 | $500 | Not Implemented |
UM0188 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,363 | $1,083 | Not Implemented |
OK0613 # 07 Y:2001 | 07 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,400 | $572 | Not Implemented |
OK0613 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $304 | $125 | Not Implemented |
OK0613 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $54,883 | $20,680 | Not Implemented |
OK0613 # 05 Y:2001 | 05 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,508 | $6,000 | Not Implemented |
OK0613 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,475 | $7,120 | Not Implemented |
OK0613 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $456 | $2,600 | Implemented |
OK0613 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,071 | $4,000 | Implemented |
OK0613 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $10,756 | $1,026 | Not Implemented |