IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0315 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,749 $7,491 Not Implemented
AS0315 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $105 $525 Not Implemented
AS0315 # 04 Y:2001 04 2001 CLEAR AND RENT EXISTING SPACE $32,448 $3,360 Not Implemented
AS0315 # 05 Y:2001 05 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $81 $306 Not Implemented
AS0315 # 06 Y:2001 06 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $2,608 $1,832 Not Implemented
AS0315 # 01 Y:2001 01 2001 USE SYNTHETIC LUBRICANT $221 $174 Not Implemented
LE0124 # 03 Y:2001 03 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,427 $1,000 Not Implemented
LE0124 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,798 $0 Not Implemented
LE0124 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $6,721 $400 Not Implemented
LE0124 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,534 $34,550 Not Implemented
LE0124 # 02 Y:2001 02 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $81,412 $10,000 Not Implemented
LE0124 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,821 $2,500 Not Implemented
UM0188 # 05 Y:2001 05 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $3,333 $1,500 Implemented
UM0188 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $263 $1,020 Not Implemented
UM0188 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,400 $2,800 Not Implemented
UM0188 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,080 $500 Not Implemented
UM0188 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,363 $1,083 Not Implemented
OK0613 # 07 Y:2001 07 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,400 $572 Not Implemented
OK0613 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $304 $125 Not Implemented
OK0613 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $54,883 $20,680 Not Implemented
OK0613 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,508 $6,000 Not Implemented
OK0613 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,475 $7,120 Not Implemented
OK0613 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $456 $2,600 Implemented
OK0613 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,071 $4,000 Implemented
OK0613 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $10,756 $1,026 Not Implemented