IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

943

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0144 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,435 $25,000 Not Implemented
TT0144 # 12 Y:2014 12 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,105 $25,000 Not Implemented
TT0144 # 13 Y:2014 13 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,928 $30,000 Not Implemented
TT0144 # 14 Y:2014 14 2014 USE PHOTOCELL CONTROLS $49,879 $7,350 Not Implemented
TT0144 # 15 Y:2014 15 2014 INSTALL OCCUPANCY SENSORS $3,094 $1,691 Not Implemented
TT0144 # 16 Y:2014 16 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,840 $25,000 Not Implemented
NC0490 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,689 $7,449 Not Implemented
NC0490 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,248 $4,989 Implemented
NC0490 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $213 $381 Implemented
NC0490 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,692 $1,922 Not Implemented
NC0490 # 05 Y:2013 05 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,690 $65,000 Implemented
NC0490 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $50 Implemented
NC0490 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $1,508 $1,217 Implemented
NC0490 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $3,207 $5,500 Implemented
NC0490 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,135 $2,192 Implemented
MA0711 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,618 $35,000 Not Implemented
MA0711 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,430 $25,000 Not Implemented
MA0711 # 03 Y:2013 03 2013 MODERATE COOLING TOWER OUTLET TEMPERATURE $6,314 $14,000 Not Implemented
MA0711 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,170 $2,000 Implemented
MA0711 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,165 $4,055 Implemented
AM0628 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,700 $675 Implemented
AM0628 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,150 $11,100 Not Implemented
AM0628 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,960 $20 Implemented
AM0628 # 04 Y:2013 04 2013 INSTALL SKYLIGHTS $3,300 $5,300 Implemented
AM0628 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,870 $35 Not Implemented