IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0143 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $12,970 $0 Implemented
DL0143 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,928 $0 Implemented
DL0143 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,582 $3,000 Implemented
DL0143 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $855 $0 Implemented
WV0450 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $173,557 $1,000 Implemented
WV0450 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $130,899 $157,320 Implemented
WV0450 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 Implemented
WV0450 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
WV0382 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $902 $0 Implemented
WV0382 # 15 Y:2008 15 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $3,539 Implemented
WV0382 # 13 Y:2008 13 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,076 $31 Implemented
WV0382 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $165,919 $5,500 Implemented
WV0382 # 02 Y:2008 02 2008 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $109,212 $38,900 Implemented
WV0382 # 06 Y:2008 06 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,768 $3,213 Implemented
WV0382 # 08 Y:2008 08 2008 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,689 $996 Implemented
WV0382 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,016 $195 Implemented
LE0247 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,225 $1,152 Implemented
LE0247 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,646 $2,500 Implemented
LE0247 # 04 Y:2006 04 2006 $24,012 $20,000 Implemented
LE0163 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $5,429 $1,434 Implemented
LE0163 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,773 $0 Implemented
WV0209 # 10 Y:2001 10 2001 INCREASE AMOUNT OF CONDENSATE RETURNED $10,653 $8,000 Implemented
WV0209 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,657 $557 Implemented
WV0209 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $21,350 $757 Implemented