IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0711 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,350 $57,195 Implemented
AM0711 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,880 $0 Implemented
AM0711 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,630 $9,030 Implemented
AM0676 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $54,800 $13,155 Implemented
AM0676 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $7,850 $4,000 Implemented
AM0628 # 08 Y:2013 08 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $520 $0 Implemented
AM0628 # 07 Y:2013 07 2013 INSULATE FEEDWATER TANK $820 $455 Implemented
AM0628 # 06 Y:2013 06 2013 INSTALL SKYLIGHTS $1,525 $0 Implemented
AM0628 # 04 Y:2013 04 2013 INSTALL SKYLIGHTS $3,300 $5,300 Implemented
AM0628 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,960 $20 Implemented
AM0628 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,700 $675 Implemented
OK0718 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,343 $1,693 Implemented
OK0718 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,226 $66,500 Implemented
OK0718 # 07 Y:2005 07 2005 USE OPTIMUM THICKNESS INSULATION $2,162 $1,710 Implemented
OK0718 # 01 Y:2005 01 2005 DEVELOP A REPAIR/REPLACE POLICY $12,970 $500 Implemented
AM0402 # 11 Y:2001 11 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,010 $0 Implemented
AM0402 # 10 Y:2001 10 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,325 $0 Implemented
AM0402 # 09 Y:2001 09 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,200 $0 Implemented
AM0402 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $19,300 $865 Implemented
AM0402 # 04 Y:2001 04 2001 REPAIR AND ELIMINATE STEAM LEAKS $27,400 $1,000 Implemented
AM0402 # 01 Y:2001 01 2001 REPAIR OR REPLACE STEAM TRAPS $632,000 $1,210 Implemented
AM0167 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,610 $4,900 Implemented
AM0167 # 01 Y:1993 01 1993 SHUT OFF PILOTS IN STANDBY EQUIPMENT $28,100 $0 Implemented
AM0167 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $10,100 $16,000 Implemented
AM0167 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,720 $4,400 Implemented