Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsSIC | 2861 | Gum And Wood Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0501 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $154,176 | $60,284 | Implemented |
UF0501 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $77,438 | $2,184 | Implemented |
UF0501 # 04 Y:2017 | 04 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $32,236 | $1,794 | Implemented |
UF0501 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,393,980 | $3,306,000 | Not Implemented |
UF0501 # 05 Y:2017 | 05 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,058 | $39,050 | Implemented |
UF0501 # 06 Y:2017 | 06 | 2017 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $9,110 | $700 | Implemented |
UF0501 # 08 Y:2017 | 08 | 2017 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,834 | $0 | Implemented |
UF0501 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,020 | $482 | Implemented |
UF0501 # 07 Y:2017 | 07 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,596 | $11,216 | Implemented |
MS0326 # 02 Y:2008 | 02 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $48,711 | $29,850 | Not Implemented |
MS0326 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,110 | $500 | Implemented |
MS0326 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,624 | $376 | Implemented |
MS0326 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $1,062,600 | $94 | Implemented |
OK0718 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $1,343 | $1,693 | Implemented |
OK0718 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,226 | $66,500 | Implemented |
OK0718 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,021 | $40,875 | Not Implemented |
OK0718 # 05 Y:2005 | 05 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,243 | $5,175 | Not Implemented |
OK0718 # 07 Y:2005 | 07 | 2005 | USE OPTIMUM THICKNESS INSULATION | $2,162 | $1,710 | Implemented |
OK0718 # 03 Y:2005 | 03 | 2005 | USE COMPRESSOR AIR FILTERS | $5,034 | $459 | Not Implemented |
OK0718 # 04 Y:2005 | 04 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,239 | $8,030 | Not Implemented |
OK0718 # 01 Y:2005 | 01 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $12,970 | $500 | Implemented |
GT0590 # 08 Y:1996 | 08 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $22,680 | $2,500 | Implemented |
GT0590 # 07 Y:1996 | 07 | 1996 | USE PHOTOCELL CONTROLS | $680 | $218 | Not Implemented |
GT0590 # 06 Y:1996 | 06 | 1996 | REDUCE EXCESSIVE BOILER BLOWDOWN | $18,987 | $400 | Implemented |
GT0590 # 05 Y:1996 | 05 | 1996 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,880 | $60,000 | Not Implemented |