IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 2861 Gum And Wood Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0501 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $77,438 $2,184 Implemented
UF0501 # 04 Y:2017 04 2017 REPAIR AND ELIMINATE STEAM LEAKS $32,236 $1,794 Implemented
UF0501 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $154,176 $60,284 Implemented
UF0501 # 05 Y:2017 05 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,058 $39,050 Implemented
UF0501 # 08 Y:2017 08 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,834 $0 Implemented
UF0501 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,020 $482 Implemented
UF0501 # 06 Y:2017 06 2017 MODERATE COOLING TOWER OUTLET TEMPERATURE $9,110 $700 Implemented
UF0501 # 07 Y:2017 07 2017 USE OPTIMUM THICKNESS INSULATION $6,596 $11,216 Implemented
MS0326 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,110 $500 Implemented
MS0326 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,624 $376 Implemented
MS0326 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,062,600 $94 Implemented
OK0718 # 01 Y:2005 01 2005 DEVELOP A REPAIR/REPLACE POLICY $12,970 $500 Implemented
OK0718 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,343 $1,693 Implemented
OK0718 # 07 Y:2005 07 2005 USE OPTIMUM THICKNESS INSULATION $2,162 $1,710 Implemented
OK0718 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,226 $66,500 Implemented
GT0590 # 09 Y:1996 09 1996 INCREASE AMOUNT OF CONDENSATE RETURNED $34,612 $31,200 Implemented
GT0590 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $22,680 $2,500 Implemented
GT0590 # 06 Y:1996 06 1996 REDUCE EXCESSIVE BOILER BLOWDOWN $18,987 $400 Implemented
GT0590 # 04 Y:1996 04 1996 ADJUST BURNERS FOR EFFICIENT OPERATION $40,100 $30,000 Implemented
GT0590 # 02 Y:1996 02 1996 REPAIR AND ELIMINATE STEAM LEAKS $30,732 $2,000 Implemented
TN0544 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,501 $0 Implemented
TN0544 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,786 $2,600 Implemented
TN0544 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,169 $5,480 Implemented
TN0544 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,905 $300 Implemented
TN0544 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,079 $314 Implemented