IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

329

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1093 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $0 Implemented
OK1093 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,354 $1,420 Implemented
OK1093 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,678 $10,052 Implemented
OK1093 # 13 Y:2023 13 2023 MAKE A NEW BY-PRODUCT $1,221,405 $1,600,000 Implemented
OK1093 # 12 Y:2023 12 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,722 $300,000 Implemented
OK1093 # 11 Y:2023 11 2023 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $98,980 $367,077 Implemented
OK1093 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,345 $8,534 Implemented
OK1093 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $343 Implemented
OK1093 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $900 Implemented
OK1093 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,723 $1,260 Implemented
OK1093 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,830 $374,400 Implemented
UD1032 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,929 $100,000 Implemented
UD1032 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,104 $0 Implemented
LS2108 # 01 Y:2021 01 2021 REPAIR AND ELIMINATE STEAM LEAKS $7,669 $2,000 Implemented
LS2108 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,759 $450 Implemented
NL0056 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,013 $11,549 Implemented
NL0056 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,032 $1,600 Implemented
NL0056 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,169 $770 Implemented
NL0056 # 01 Y:2021 01 2021 OPERATE DISTILLATION COLUMNS EFFICIENTLY $222,300 $82,500 Implemented
MI0369 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,259 $580 Implemented
MI0369 # 02 Y:2020 02 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,954 $7,492 Implemented
MI0369 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,267 $1,980 Implemented
UF0541 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,964 $16,606 Implemented
UF0541 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $365,719 $1,800,000 Implemented
UF0541 # 03 Y:2019 03 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,041 $3,368 Implemented