IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

731

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0235 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,612 $3,553 Implemented
SF0235 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,228 $2,805 Implemented
SF0235 # 14 Y:2002 14 2002 OPTIMIZE PLANT POWER FACTOR $4,195 $7,970 Implemented
LL0135 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,016 $13,170 Implemented
LL0135 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN WATER LINES AND VALVES $11,865 $3,600 Implemented
LL0135 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $9,698 $1,016 Implemented
LL0135 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $8,850 $1,326 Implemented
LL0135 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $8,388 $2,540 Implemented
LL0135 # 10 Y:2002 10 2002 INSULATE BARE EQUIPMENT $3,301 $957 Implemented
LL0135 # 12 Y:2002 12 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,154 $300 Implemented
LL0135 # 13 Y:2002 13 2002 INSULATE BARE EQUIPMENT $154 $102 Implemented
LE0126 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,515 $4,320 Implemented
LE0126 # 07 Y:2002 07 2002 IMPROVE LUBRICATION PRACTICES $1,283 $200 Implemented
SF0230 # 01 Y:2002 01 2002 APPLY A PROTECTIVE COATING TO RACKS AND TANKS $401 $0 Implemented
SF0230 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $537 $474 Implemented
IA0280 # 05 Y:2001 05 2001 REPAIR OR REPLACE STEAM TRAPS $87,600 $7,916 Implemented
IA0280 # 06 Y:2001 06 2001 REPAIR AND ELIMINATE STEAM LEAKS $25,698 $10,330 Implemented
SF0226 # 05 Y:2001 05 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $35,839 $11,800 Implemented
SF0226 # 06 Y:2001 06 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $844 $535 Implemented
SF0226 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,016 $3,275 Implemented
SF0226 # 08 Y:2001 08 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,717 $2,500 Implemented
SF0226 # 10 Y:2001 10 2001 INSTALL OCCUPANCY SENSORS $1,758 $2,040 Implemented
SF0226 # 11 Y:2001 11 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $863 $1,126 Implemented
LL0122 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,898 $660 Implemented
LL0122 # 05 Y:2001 05 2001 USE PHOTOCELL CONTROLS $8,786 $495 Implemented