Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsSIC | 289 | Miscellaneous Chemical Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0748 # 07 Y:2018 | 07 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,160 | $145 | Implemented |
AM0748 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,020 | $345 | Implemented |
AM0748 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,640 | $0 | Implemented |
AM0748 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,425 | $1,000 | Implemented |
AM0748 # 03 Y:2018 | 03 | 2018 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $13,900 | $18,200 | Implemented |
AM0748 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,300 | $51,700 | Implemented |
AM0651 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,745 | $735 | Implemented |
AM0651 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,525 | $400 | Implemented |
AM0651 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,180 | $1,500 | Implemented |
AM0651 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,615 | $1,485 | Implemented |
AM0651 # 06 Y:2014 | 06 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,950 | $0 | Implemented |
AM0651 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,725 | $500 | Implemented |
AM0630 # 06 Y:2013 | 06 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,270 | $0 | Implemented |
AM0630 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,450 | $27,300 | Implemented |
AM0630 # 02 Y:2013 | 02 | 2013 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $27,290 | $1,600 | Implemented |
AM0630 # 01 Y:2013 | 01 | 2013 | USE EVAPORATION TO CONCENTRATE MATERIAL | $27,000 | $5,000 | Implemented |
AM0630 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,300 | $1,040 | Implemented |
AM0630 # 04 Y:2013 | 04 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $97,740 | $5,000 | Implemented |
AM0630 # 07 Y:2013 | 07 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,240 | $350 | Implemented |
AM0630 # 11 Y:2013 | 11 | 2013 | REUSE RAGS UNTIL COMPLETELY SOILED | $480 | $0 | Implemented |
AM0606 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $900 | $3,110 | Implemented |
AM0591 # 04 Y:2011 | 04 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $9,540 | $5,000 | Implemented |
AM0591 # 05 Y:2011 | 05 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $5,270 | $1,300 | Implemented |
AM0591 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $10,060 | $15,900 | Implemented |
AM0591 # 12 Y:2011 | 12 | 2011 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $310 | $170 | Implemented |