Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
598
matching recommendationsSIC | 2891 | Adhesives And Sealants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0615 # 05 Y:2001 | 05 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,615 | $12,800 | Not Implemented |
UD0615 # 06 Y:2001 | 06 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,831 | $8,500 | Implemented |
UM0160 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,149 | $200 | Implemented |
UM0160 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $582 | $50 | Implemented |
UM0160 # 03 Y:2000 | 03 | 2000 | USE POWER DURING OFF-PEAK PERIODS | $55,632 | $22,000 | Implemented |
UM0160 # 04 Y:2000 | 04 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $2,800 | $220 | Implemented |
UM0160 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $7,300 | $500 | Implemented |
UM0160 # 06 Y:2000 | 06 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,600 | $300 | Not Implemented |
CO0458 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,320 | $10,000 | Not Implemented |
CO0458 # 02 Y:2000 | 02 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,970 | $2,320 | Not Implemented |
CO0458 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,300 | $1,700 | Not Implemented |
CO0458 # 04 Y:2000 | 04 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,000 | $2,360 | Implemented |
CO0458 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $270 | Implemented |
CO0458 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $0 | Not Implemented |
CO0458 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $120 | $0 | Not Implemented |
CO0458 # 08 Y:2000 | 08 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $9,860 | $500 | Not Implemented |
CO0458 # 09 Y:2000 | 09 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $5,280 | $6,720 | Implemented |
GT0679 # 01 Y:1999 | 01 | 1999 | COMBINE UTILITY METERS | $1,400 | $0 | Not Implemented |
GT0679 # 02 Y:1999 | 02 | 1999 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $27,261 | $5,000 | Not Implemented |
GT0679 # 03 Y:1999 | 03 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $1,157 | $200 | Implemented |
GT0679 # 04 Y:1999 | 04 | 1999 | INSULATE FEEDWATER TANK | $4,877 | $5,350 | Implemented |
GT0679 # 05 Y:1999 | 05 | 1999 | CLOSE OFF UNNEEDED STEAM LINES | $164 | $50 | Implemented |
GT0679 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,006 | $46,917 | Not Implemented |
GT0679 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,625 | $14,270 | Not Implemented |
GT0634 # 01 Y:1998 | 01 | 1998 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $290 | $800 | Not Implemented |