Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 2899 | Chemical Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1056 # 06 Y:2023 | 06 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,784 | $0 | Implemented |
UD1056 # 11 Y:2023 | 11 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $228 | $368 | Implemented |
UD1056 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,824 | $0 | Implemented |
UD1056 # 07 Y:2023 | 07 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $7,938 | $800 | Implemented |
UD1056 # 05 Y:2023 | 05 | 2023 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $17,114 | $3,100 | Implemented |
UD1056 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,442 | $0 | Implemented |
UD1056 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,193 | $0 | Implemented |
UD1056 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,573 | $0 | Implemented |
UD1056 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,474 | $250 | Implemented |
UD1056 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $7,204 | $1,800 | Implemented |
UD0887 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,553 | $50 | Implemented |
UD0887 # 13 Y:2013 | 13 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $383 | $0 | Implemented |
UD0887 # 11 Y:2013 | 11 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $2,637 | $3,420 | Implemented |
UD0887 # 06 Y:2013 | 06 | 2013 | ADD AREA LIGHTING SWITCHES | $594 | $350 | Implemented |
UD0887 # 04 Y:2013 | 04 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,763 | $2,075 | Implemented |
UD0887 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $497 | $500 | Implemented |
UD0887 # 02 Y:2013 | 02 | 2013 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,438 | $0 | Implemented |
UD0607 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $1,428 | $3,135 | Implemented |
UD0607 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,478 | $7,485 | Implemented |
UD0607 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,566 | $0 | Implemented |
UD0509 # 10 Y:1996 | 10 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,492 | $3,080 | Implemented |
UD0509 # 09 Y:1996 | 09 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $512 | $1,600 | Implemented |
UD0509 # 07 Y:1996 | 07 | 1996 | USE PHOTOCELL CONTROLS | $1,279 | $621 | Implemented |
UD0509 # 03 Y:1996 | 03 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,600 | $5,000 | Implemented |
UD0509 # 02 Y:1996 | 02 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,840 | $0 | Implemented |