IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1056 # 06 Y:2023 06 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,784 $0 Implemented
UD1056 # 11 Y:2023 11 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $228 $368 Implemented
UD1056 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,824 $0 Implemented
UD1056 # 07 Y:2023 07 2023 REPAIR OR REPLACE STEAM TRAPS $7,938 $800 Implemented
UD1056 # 05 Y:2023 05 2023 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $17,114 $3,100 Implemented
UD1056 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,442 $0 Implemented
UD1056 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,193 $0 Implemented
UD1056 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,573 $0 Implemented
UD1056 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,474 $250 Implemented
UD1056 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $7,204 $1,800 Implemented
UD0887 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,553 $50 Implemented
UD0887 # 13 Y:2013 13 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $383 $0 Implemented
UD0887 # 11 Y:2013 11 2013 DEVELOP A REPAIR/REPLACE POLICY $2,637 $3,420 Implemented
UD0887 # 06 Y:2013 06 2013 ADD AREA LIGHTING SWITCHES $594 $350 Implemented
UD0887 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $8,763 $2,075 Implemented
UD0887 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $500 Implemented
UD0887 # 02 Y:2013 02 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,438 $0 Implemented
UD0607 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,428 $3,135 Implemented
UD0607 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,478 $7,485 Implemented
UD0607 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,566 $0 Implemented
UD0509 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,492 $3,080 Implemented
UD0509 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $512 $1,600 Implemented
UD0509 # 07 Y:1996 07 1996 USE PHOTOCELL CONTROLS $1,279 $621 Implemented
UD0509 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,600 $5,000 Implemented
UD0509 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,840 $0 Implemented