IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0611 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,410 $3,724 Not Implemented
OR0611 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $2,436 $2,159 Not Implemented
OR0611 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $5,340 $11,938 Not Implemented
OR0611 # 03 Y:2013 03 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,909 $37,830 Not Implemented
OR0611 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $8,684 $5,600 Not Implemented
IA0499 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $7,492 $3,371 Not Implemented
IA0499 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,513 $210 Not Implemented
IA0499 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,445 $4,953 Not Implemented
IA0499 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $1,768 $3,800 Implemented
IA0499 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $1,343 $1,425 Not Implemented
IA0499 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,972 $830 Not Implemented
IA0499 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $521 $800 Not Implemented
IA0499 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,315 $700 Not Implemented
UA0100 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,332 $1,800 Implemented
UA0100 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,757 $1,062 Implemented
UA0100 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,852 $11,493 Not Implemented
UA0100 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $70 $43 Implemented
SD0468 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,265 $23,840 Implemented
SD0468 # 02 Y:2013 02 2013 MODIFY STARTUP/SHUTDOWN TIMES $7,607 $1,050 Implemented
SD0468 # 03 Y:2013 03 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,278 $1,600 Implemented
SD0468 # 04 Y:2013 04 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,973 $5,650 Not Implemented
SD0468 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,073 $700 Implemented
IA0494 # 09 Y:2013 09 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $724 $1,000 Not Implemented
IA0494 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,861 $10,000 Not Implemented
IA0494 # 07 Y:2013 07 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,710 $5,400 Implemented