IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

699

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0109 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $320 Not Implemented
UF0109 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $819 $1,911 Implemented
UF0109 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $434 $500 Implemented
UF0109 # 07 Y:1995 07 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $10,129 $1,500 Not Implemented
AS0130 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,427 $16,440 Not Implemented
AS0130 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $2,028 $1,000 Not Implemented
AS0130 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,494 $2,571 Implemented
AS0130 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,335 $0 Not Implemented
AS0130 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $1,066 $1,006 Not Implemented
AS0130 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $567 $250 Implemented
AS0130 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $1,477 $748 Not Implemented
GT0510 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,220 $9,990 Not Implemented
GT0510 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $930 Not Implemented
GT0510 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,250 $500 Implemented
GT0510 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,880 $5,260 Implemented
GT0510 # 05 Y:1993 05 1993 INCREASE AMOUNT OF CONDENSATE RETURNED $10,100 $6,500 Not Implemented
GT0510 # 06 Y:1993 06 1993 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $134,080 $250,000 Implemented
GT0510 # 07 Y:1993 07 1993 REPAIR AND ELIMINATE STEAM LEAKS $20,590 $2,400 Implemented
GT0510 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $2,160 Not Implemented
MA0282 # 01 Y:1993 01 1993 USE OPTIMUM TEMPERATURE $22,157 $11,271 Not Implemented
MA0282 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,828 $23,220 Implemented
MA0282 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,041 $1,622 Implemented
MA0282 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,625 $2,854 Implemented
MA0282 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,721 $0 Not Implemented
MA0282 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $475 $0 Implemented