Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0359 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $472 $10,000 Implemented
UM0359 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $1,161 $30,000 Implemented
UM0359 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,620 $10,000 Implemented
UM0359 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,630 $5,000 Not Implemented
UM0359 # 06 Y:2009 06 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,724 $7,574 Not Implemented
UM0359 # 05 Y:2009 05 2009 INSTALL STORM WINDOWS AND DOORS $6,298 $24,510 Implemented
UM0359 # 04 Y:2009 04 2009 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,980 $9,000 Not Implemented
UM0359 # 03 Y:2009 03 2009 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $13,963 $400 Implemented
UM0359 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,026 $50,000 Implemented
UM0359 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $20,146 $500 Implemented
UM0261 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,377 $47,700 Not Implemented
UM0261 # 06 Y:2004 06 2004 COVER OPEN TANKS $625 $300 Implemented
UM0261 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,770 $1,711 Implemented
UM0261 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $6,503 $500 Implemented
UM0261 # 03 Y:2004 03 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,493 $2,000 Implemented
UM0261 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $96,676 $11,096 Not Implemented
UM0152 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $13,333 $1,200 Not Implemented
UM0152 # 05 Y:2000 05 2000 METER WASTE WATER $1,288 $500 Not Implemented
UM0152 # 04 Y:2000 04 2000 RECOVER AND REUSE COOLING WATER $1,649 $3,826 Implemented
UM0152 # 03 Y:2000 03 2000 USE LESS WASTEFUL PACKAGING $147,272 $0 Implemented
UM0152 # 02 Y:2000 02 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $282 $618 Not Implemented
UM0152 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $200 Implemented
UM0131 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,173 $10,972 n/a
UM0131 # 08 Y:1999 08 1999 CLEAR AND RENT EXISTING SPACE $63,991 $63,991 n/a
UM0131 # 07 Y:1999 07 1999 METER WASTE WATER $2,154 $500 n/a