IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0622 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $252 $667 Implemented
WV0622 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $372 $340 Implemented
WV0622 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $656 $2,840 Implemented
WV0622 # 06 Y:2022 06 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $707 $2,525 Implemented
WV0622 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $898 $300 Implemented
WV0622 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,610 $3,100 Implemented
DL0152 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,330 $164,300 Implemented
DL0152 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,540 $1,325,000 Implemented
DL0152 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,290 $69,750 Implemented
WV0395 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $144,811 $1,000 Implemented
WV0395 # 10 Y:2009 10 2009 INSTALL OCCUPANCY SENSORS $485 $300 Implemented
WV0395 # 08 Y:2009 08 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $18,362 $1,925 Implemented
WV0395 # 07 Y:2009 07 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $26,253 $2,304 Implemented
WV0216 # 08 Y:2001 08 2001 BURN WASTE OIL FOR HEAT $55,440 $10,000 Implemented
WV0216 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,354 $75 Implemented
WV0216 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $99 $80 Implemented
WV0216 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,557 $1,500 Implemented
WV0216 # 03 Y:2001 03 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,413 $1,000 Implemented
HO0166 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,998 $2,855 Implemented
HO0166 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,530 $400 Implemented
HO0166 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,420 $500 Implemented